Las Cruces Downtown

  • About LCCP
    • Development Strategy
    • LCCP Development Team
  • About Las Cruces
    • About Downtown Las Cruces
      • Shopping
      • Dining
      • Arts and Entertainment
    • About the Region
    • Las Cruces Downtown Redevelopment Commitment
    • Downtown Events
    • Las Cruces Rankings and Honors
  • The Plan
    • Downtown Master Plan
    • Final Plaza Design Concept
    • Aerial Photos
    • Location Map
    • Downtown Distance Map
    • Downtown Las Cruces Residential Opportunities
  • Projects
    • Old City Hall
    • Bank of the West
    • 201 South Main Street
    • Old County Court House and Annex
    • Amador Hotel
    • Historic Post Office
    • Vacant Land
    • Downtown Civic Plaza
  • FAQ’s
    • FAQ’s
    • Studies and Documents
    • Final Plaza Design Concept
  • Photo Gallery
    • Historic Rio Grande Theatre
    • Las Cruces Farmers Market
    • Downtown Las Cruces Salsa Fest
    • LCCP Downtown Properties
    • Video Interviews
  • News
  • Contact Us

LCCP partnering with city of Las Cruces in downtown plaza project

July 18, 2014 by tiffany

By Patrick Hayes
LAS CRUCES, N.M. – Nick Ray opened Main Street Bistro and Ale House in January. He told KFOX14 he chose downtown Las Cruces because it had potential to grow.

He was excited when the city council, meeting as the city’s Tax Increment Development District, voted on Monday to issue $5.5 million in bonds to build a plaza across the street. Las Cruces Mayor Ken Miyagishima said, “It’s going to be a gathering point and the focal point for Las Cruces.”

The city already has an agreement to buy land from a local developer, but council members needed to approve the release of bonds before construction could begin.

Some of the money will be used to purchase property from a bank. That area is located on the northeast corner of Griggs Avenue and Main Street.

Construction should start in January and finish in early 2016.

Click here to read full article…

Filed Under: Uncategorized

Las Cruces Downtown Partnership Plans 5-star hotel

May 23, 2014 by tiffany

Lease signed for Doña Ana County Courthouse Downtown

By Alta LeCompteLas Cruces Bulletin

The afternoon sun, shining through tall, slender windows, reflected off the white walls and illuminated painted details of the 20-foothigh ceiling of the former Doña Ana County courtroom.

Many of the visitors who toured the old courthouse Saturday, Feb. 15, had been in the building in the past but had never seen the ceiling before: A dropped ceiling had concealed its beauty when the space had been divided into offices.

“It’s phenomenal,” Sharon White said of the proposal to restore the former courthouse as a hotel and conference center.

White was one of one of hundreds of visitors taking the Mesilla Valley Preservation Inc. Casas de Antaño tour who paused to look at architectural drawings and photos of Downtown in its heyday.

Just days before the Saturday open house, the Las Cruces Community Partners, a group of developers led by managing partner Bob Pofahl, had signed a 70-year lease agreement for the property with owner John Hoffman.

Meet, eat and sleep Downtown

LCCP envisions the property as a five-star hotel and conference center at the corner of Main Street and Alameda Boulevard. The existing courthouse, completed in 1937, would become a conference center with several restaurants. The2,600-square-foot courtroom would serve as the main banquet room.

Some 70 rooms would be built on the west side, continuing the Mission Revival architecture of the courthouse.

Plans call for demolishing the old jail, which was built after the courthouse, to make a space for the hotel rooms.

“The architecture of the new building will be really integrated with the existing building,” Pofahl said.

He said Stefanos Polyzoides of Pasadena, Calif., a nationally known proponent of “the architecture of place,” and Las Crucen Steve Newby of Steve Newby Architects and Associates Inc. will serve as the architects responsible for the historical interpretation and functionality of the space.

The one that got away (from Trost)

The courthouse was designed by Percy McGee.

Pofahl said noted El Paso architect Henry Trost bid on the job, but his design was not chosen.

“We love Trost, but this is one time we’re glad he wasn’t selected,” Pofahl said, explaining that Trost’s design had a strong Moorish influence, while the plan submitted by McGee was in the Southwestern tradition.

Pofahl said the LCCP plans to preserve the history of the building in the redevelopmentprocess.

Public spaces will feature artifacts and exhibits of local history. Rooms and public spaces will contain photos, art and artifacts that recallthe history of the courthouse.

Pofahl said he was gratified with the responseof the visitors to the exhibits, tells him the LCCP is on track with its commitment to honoring the history of the building.

He said the proposed hotel and conference center would serve as a southern anchor for Downtown revitalization that kicked into gear last year with the restoration of two-way traffic and streetscape enhancements to Main Street Downtown.

“Our research indicates future demand for a five-star, full-service hotel as a regional tourist destination can be supported as part of the redevelopment of Downtown Las Cruces and Main Street,” he said. “It’s extremely important to create a destination that’s a good location for both tourists and business travelers.

“LCCP is in discussions with LaTour Signature Hotels by ResortCom International of San Diego as the operator for the proposed courthouse hotel and conference center.”

Owner, developer field questions

Both Pofahl and Hoffman were on hand Saturday to answer questions.

“John Hoffman did a great job of beginning to restore the building, preserving all the original structure and removing stuff that had been added over the years, so we can now complete the restoration,” Pofahl said.

He credited Hoffman with completing the environmental remediation and reroofing the entire structure to ensure its stability.

Hoffman said he had begun restoration of the courthouse property, replacing most its systems. It was he who exposed the original ceiling, oak wainscoting and other details that create an unpretentious elegance well suited to the desert Southwest, and well suited to become the bones of the main ballroom for a fivestar hotel Pofahl envisions for the property.

He abandoned the restoration more than two years ago due to a possible legal dispute over the ownership of a 30-foot strip of land on an old plat labeled alley, for which there was no dedication.

“The city said it might want to claim it,” he said. “That was the last straw.”

Pofahl said planning, design and restoration of the property is expected to take about two years and cost about $20 million.

He said there are no zoning or legal hurdles to be cleared and there are no impediments to redevelopment.

He said the marketing study will be completed in about six months, during which time LCCP will work with the architectural firms to define the potential uses of the building.

“The design alone will take 12 to 18 months,” Pofahl said. “You only get one chance to do this. You want to do it right.

“We believe this is one of the most iconic, historic buildings in southern New Mexico. It needs to be studied, repurposed and restored very carefully.”

Filed Under: Uncategorized

Featured image: Las Cruces Country Music Festival courtesy of William Faulkner Studios

201 N. Church St., Ste. 330
Las Cruces, NM 88001
Mobile 575-680-8812
Office 575-523-2500

Pages

  • Home
  • Dining
  • Arts and Entertainment
  • Shopping
  • About Downtown Las Cruces
  • About Las Cruces Community Partners

Newsletter

Copyright © 2023 Las Cruces Downtown Site designed and managed by Pixelmark